Why it matters in the field
Its electrical length depends on frequency and velocity factor, and its transformation becomes frequency-sensitive when the load is reactive or broadband operation is expected.
What to do
Measure or define both impedances, choose the required line impedance, calculate electrical length with the actual cable velocity factor, and trim while measuring the installed system.
The common mistake
Cutting a free-space quarter wavelength and ignoring cable velocity factor and load reactance.
Current regulations, safety clearances, equipment manuals, exact antenna geometry, and site conditions control. Test the complete installed system at low power before relying on it.