Deployment sequence
- Lay out the complete footprint before raising anything.
- Build and stabilize the base before loading the mast.
- Attach antenna and guy hardware in the order required by the current guides.
- Route feed line and wire so they do not pull the support sideways or cross public paths.
Before raising the antenna
- Count height, weight, wind area, leverage, coax pull, wire tension, transport, and fall zone.
- Choose a base for the site: ground, clamp, surveyor tripod, vehicle, deck, wall, or sleeve only where documented.
- Use the stricter limit whenever the antenna, mast, mount, adapter, or environment disagrees.
Before transmitting
- Confirm every mast section, clamp, mount, adapter, guy line, antenna attachment, coax route, and RF-return conductor.
- Begin RF checks at low power after the final geometry is stable.
- Record the exact configuration so a successful setup can be reproduced.
- Reject power-line exposure, lightning, uncontrolled wind, weak surfaces, and public trip hazards.
- Keep the fall zone clear.